Connect with us

Bulloch Public Safety

AllOnAdventure Logo

SE Ga Road Work: Weekly Traffic Interruption Advisory Through January 20

Georgia DOT continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, January 14 through Friday, January 20.

Pro Roof GA
The Button - donate today!

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.


Interstate 95

I-95                                                                 McIntosh County
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0) 
Lane Closures for Bridge Maintenance/Rehabilitation
Monday- Thursday 7pm-7am
Weekends – Friday 9pm until Monday 5am
Thru October 31, 2023

Interstate 16 

I-16 (in the Vicinity of SR 307)         Chatham County            
Lane Closures for DDI Construction on Exit 160/SR 307
Eastbound MP 159.8 to MP 160.2

  • Monday – Saturday 9am – 4pm

Westbound from MP 159.8 to MP 160.2

  • Monday – Saturday 8am – 3pm

Exit 160/SR 307 Pine Meadow Drive to Town Center Drive

  • Monday – Saturday 8am – 3pm

Through Jan. 31, 2023

I-16                                                     Bulloch County
Exit 111 (Excelsior Rd) to Exit 127 (SR 67)
Daily lane closures to repair concrete pavement

I-16                                                      Chatham County
Exit 152 (SR 17) to Exit 155 (Pooler Parkway)
Nightly lane closures to repair concrete pavement

Interstate 516 

I-516 Montgomery St to Abercorn St Chatham County
Emergency Sewer Repair Work
Continuous Lane Closures
Two of Three Lanes Closed

Bridge & Road Closures with Detours

Daisy Nevils Rd                                        Evans County
Road Closure for Bridge Replacement
Expected Reopen End of March 2023
Detour via Deloach Church Rd & Mosley Rd

US 82 West @ Big Creek                  Brantley County
Road Closure for Bridge Replacement
3 Miles West of Hoboken
Expected Reopen in Early 2023
Single Lane Traffic in Both Directions thru Work Zone
On-site Detour: WB Traffic Shift to EB Bridge

Piney Grove Rd at Colemans Creek   Appling County
Road Closure for Bridge Replacement
Expected to Reopen January 16, 2023
Detour via SR 203, SR 121, SR 15

Ten Mile Church Road                      Bacon County
Road Closure for Bridge Replacement
Starting Monday, January 16,2023
Expected to Reopen July 2023
Detour via Radio Station Rd, S Pierce St., SR 32, SR 203

Bridge Construction, Rehabilitation, and Maintenance

State Route 25                                  Chatham County 
Appleby Road (MP 19) to South Carolina State Line
Alternating Lane Closures for Bridge Construction
Monday – Saturday 9am – 4pm
Through February 28, 2023

SR404 Spur on Talmadge Bridge   Chatham County
Savannah Harbor Pkwy to Louisville Rd
Single Lane Closures EB & WB
Wed. thru Fri., 9am to 4pm
For Geocomp Wind Survey

US 17 on Sidney Lanier Bridge        Glynn County
Single Lane closures Mon. & Tues. 7am-7pm
Monday – Southbound
Tuesday – North and south bound
For Geocomp Wind Survey

SR26/US80 Bull River Bridge          Chatham County
Continuous Lane Closures 10 day on/4 days off
For Required Preliminary Bridge Work
Completion expected in mid to late Feb.

SR26/US80/Lazaretto Creek Bridge Chatham County
Continuous Lane Closures
For Required Preliminary Work
Monday-Sunday
Through Completion

SR 4/US 1 Over Altamaha River       Appling-Toombs Co.
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday, 7am to 6pm (May 2023)

Resurfacing

SR 204/Fort Argyle Rd                      Chatham County
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
Monday – Friday, 7pm to 6am

SR 26/HWY 80                                  Chatham County
From Bourne Ave to Wilkes Street
Daily/Nightly Lane Closures for Resurfacing
9pm to 6am

SR 196/SR 119                                  Liberty County
From Gate1 to Gate 5
MP 0.0 to 3.51 SR 196
Nightly Lane Closures for Milling and Resurfacing
7pm to 5am
Monday- Saturday 1/16/23 – 01/21/2023

SR 27                                                Wayne County
East Railroad St to the Glynn County Line
MP 7.33 to MP 35.41
Daily/Nightly Lane Closures for Resurfacing
4/20/22 – 1/31/23

SR 38                                                Wayne County
CW Collins St (Screven) to SR 203
MP 2.38 to MP 8.98
Daily/Nightly Lane Closures for Resurfacing
12/8/22 – 3/31/23

SR 25 Connector (Gloucester St.)  Glynn County
SR 27 to SR 25
MP 7.33 to MP 35.41
Nightly Lane Closures for Resurfacing
7pm to 6am
9/12/22 – 1/31/23

SR 21 Business 21 / Leola Road     Screven County 
MP 16.58 to MP 0
Daily Lane Closure & Flagging Operation
Mill & Resurfacing
7am to 7pm
1/9/2023 – 3/31/2023

Old Highway 250                              Tattnall County
Mainline Left / Right Lane Closed due to Shoulder Widening
Monday – Saturday 7am – 8pm
Starting 2/1/2023 – 9/30/2023

Other Traffic Interruptions

CR238 (Buck Creek Road)                   Screven County
South Prong Buck Creek and Buck Creek Tributary Bridges
Single Lane Closure for Bridge Investigation
Daily Lane Closure 8am – 5pm
Monday 1/16/2023 – Tuesday 1/17/2023

SR23/SR57                                         Tattnall County
SR169 to SR121
Daily Lane Closures for Road Widening
8am – 3pm
Starting 12/20/22 – 12/10/23

SR 21/SR 30                                      Chatham County
I-95/SR 405 to Berrien Rd                              
Nightly Lane Closures for Earth Work on Shoulders and Median
Starting 7pm-6am
Tuesday 1/13/2023 – Friday 1/20/2023

SR 40                                                Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 6/30/2023

SR 21 MP 6.6 to MP 27.7                   Effingham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Daily/Nightly Lane Closures Saturday and Sunday
3/31/22 – 4/30/23

SR 25/Burnsed Blvd.                        Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm

  • Burnsed Boulevard reduced to two lanes from Hwy 80 through

the intersection of SR 25. Traffic will move to the southbound lanes,
which will become one lane in each direction.

  • SR25 North from Bay Street closed to through traffic. Only trucks

needing access to Foundation Drive.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *