Connect with us

Bulloch Public Safety

AllOnAdventure Logo

GDOT: Interstate Lane Closure for the I-16 at I-95 Improvement Projects Through July 16

FYI for those traveling to and from Chatham

Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

NOTE: Detour information is shown in red text.


Daytime Closures

Monday, July 11, through Saturday, July 16, 8 a.m. to 3 p.m.
Intermittent right and left lane closures at the following locations:

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Monday, July 11, through Saturday, July 16, 9 a.m. to 4 p.m.
Intermittent right and left lane closures at the following locations:

  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Monday, July 11, through Saturday, July 16, 8 a.m. to 5 p.m.
Intermittent right and left lane closures at the following locations:

  • I-516 westbound at the I-16 Interchange from MP 5 to MP 6
  • I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Overnight Closures

Monday, July 11, through Saturday, July 16, 7 p.m. to 6 a.m.
Intermittent right and left lane closures at the following locations:

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

Monday, July 11, through Saturday, July 16, 9 p.m. to 5 a.m.
Double lane closures at the following locations:

  • I-95 northbound @ I-16 overpass (MP 98 to MP 100)
  • I-95 southbound @ I-16 overpass (MP 101 to MP 98)

Continuous Closures

Friday, July 8, 7 p.m. through Monday, July 11, 5 a.m.
Single lane closures at the following location

  • I-95 southbound @ I-16 overpass (MP 99 to MP 98)

LONG-TERM CLOSURE

June 2, 2022, through May 31, 2023

  • Tremont Road under I-16 (Map)

Note: Tremont Road will be open during holiday work restriction time frames.

  • Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4).
  • Motorists traveling on Tremont Road south of I-16 should take I-516 westbound to West Gwinnett Street (Exit 6), turn left on West Gwinnett Street, then left on Telfair Road to access Tremont Road north of I-16.


Advisory: Exact times may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *