Georgia DOT continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, January 7 through Friday, January 13.
All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.
Traffic interruptions are listed below by interstates, categories, and counties.
Interstate 95
I-95 McIntosh County
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0)
Lane Closures for Bridge Maintenance/Rehabilitation
Monday- Thursday 7pm-7am
Weekends – Friday 9pm until Monday 5am
Thru October 31, 2023
Interstate 16
I-16 (in the Vicinity of SR 307) Chatham County
Lane Closures for DDI Construction on Exit 160/SR 307
Eastbound MP 159.8 to MP 160.2
- Monday – Saturday 9am – 4pm
Westbound from MP 159.8 to MP 160.2
- Monday – Saturday 8am – 3pm
Exit 160/SR 307 Pine Meadow Drive to Town Center Drive
- Monday – Saturday 8am – 3pm
Bridge & Road Closures with Detours
Daisy Nevils Rd
Road Closure for Bridge Replacement
Expected Reopen End of March 2023
Detour via Deloach Church Rd & Mosley Rd
US 82 West @ Big Creek Brantley County
Road Closure for Bridge Replacement
3 Miles West of Hoboken
Expected Reopen in Early 2023
Single Lane Traffic in Both Directions thru Work Zone
On-site Detour: WB Traffic Shift to EB Bridge
Piney Grove Rd at Colemans Creek Appling County
Road Closure for Bridge Replacement
Expected to Reopen January 12, 2023
Detour via SR 203, SR 121, SR 15
Bridge Construction, Rehabilitation, and Maintenance
State Route 25
Appleby Road (MP 19) to the South Carolina State Line
Lane Closures for Bridge Construction
Mon.– Sat. 9am – 4pm until March
SR26/US80 Bull River Bridge Chatham County
Continuous Lane Closures
For Required Preliminary Work
Monday-Sunday
Through Completion
SR26/US80/Lazaretto Creek Bridge Chatham County
Continuous Lane Closures
For Required Preliminary Work
Monday-Sunday
Through Completion
SR 4/US 1 Over Altamaha River Appling-Toombs Co.
West River Rd. (Appling Co.) to George Hill Rd. (Toombs Co.)
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday, 7am to 6pm (May 2023)
Resurfacing
SR 204/Fort Argyle Rd Chatham County
From Old River Rd to Gateway Blvd
Lane Closures for Asphalt Resurfacing
Monday – Friday, 7pm to 6am
SR 26/HWY 80 Chatham County
From Bourne Ave to Wilkes Street
Daily/Nightly Lane Closures for Resurfacing
9pm to 6am
SR 196/SR 119 Liberty County
From Airport Road to General Screven Way
MP 0.0 to 3.51 SR 196
Nightly Lane Closures for Milling and Resurfacing
7pm to 5am
Monday- Saturday 1/09/22 – 01/14/2022
SR 27
East Railroad St to the Glynn County Line
MP 7.33 to MP 35.41
Daily/Nightly Lane Closures for Resurfacing
4/20/22 – 1/31/23
SR 38
CW Collins St (Screven) to SR 203
MP 2.38 to MP 8.98
Daily/Nightly Lane Closures for Resurfacing
12/8/22 – 3/31/23
SR 25 Connector (Gloucester St.) Glynn County
SR 27 to SR 25
MP 7.33 to MP 35.41
Nightly Lane Closures for Resurfacing
7pm to 6am
9/12/22 – 1/31/23
SR 21 Business 21 / Leola Road Screven County
MP 16.58 to MP 0
Daily Lane Closure & Flagging Operation
Mill & Resurfacing
7am to 7pm
Resume 1/9/2023 – 3/31/2023
Old Highway 250 Tattnall County
Mainline Left / Right Lane Closed due to Shoulder Widening
Monday – Saturday 7am – 8pm
Starting 1/2/2023 – 9/30/2023
Other Traffic Interruptions
SR23/SR57
SR169 to SR121
Daily Lane Closures for Road Widening
8am – 3pm
Starting 12/20/22 – 12/10/23
SR 21/SR 30 Chatham County
I-95/SR 405 to Berrien Rd
Nightly Lane Closures for Earth Work on Shoulders and Median
Starting 7pm-6am
Tuesday 1/6/2023 – Friday 1/13/2023
SR 40
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday thru Friday, 7am to 5pm
Ends 6/30/2023
SR 21 MP 6.6 to MP 27.7 Effingham County
Installation of Cable Barrier
Lane Closures Mon. – Fri. 9am-3:30pm & 7pm-6am
Daily/Nightly Lane Closures Saturday and Sunday
3/31/22 – 4/30/23
SR 25/Burnsed Blvd. Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm
- Burnsed Boulevard reduced to two lanes from Hwy 80 through
the intersection of SR 25. Traffic will move to the southbound lanes,
which will become one lane in each direction.
- SR25 North from Bay Street closed to through traffic. Only trucks
needing access to Foundation Drive.