Connect with us

Bulloch Public Safety

AllOnAdventure Logo

GDOT: Traffic Impacts for the I-16 at I-95 Improvement Projects Through January 28

FYI for those traveling to and from Chatham

 Weather permitting, Georgia Department of Transportation (Georgia DOT) construction partners will close interstate lanes at the locations below for the 16@95 Improvement Projects, which will widen I-16 and reconstruct the I-16/I-95 Interchange. The lane closures are necessary for widening activities for I-16 and bridge work at the I-16/I-516 Interchange.

NOTE: Detour information is shown in red text.


Continuous Lane Closures

Friday, January 20, through Saturday, January 21, 8 p.m. to 9 a.m.
Left lane closure at the following location:

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Daytime Closures

Monday, January 23, through Saturday, January 28, 8 a.m. to 3 p.m.
Intermittent right and left lane closures at the following locations:

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)

Monday, January 23, through Saturday, January 28, 9 a.m. to 4 p.m.
Intermittent right and left lane closures at the following locations:

  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)

Monday, January 23, through Saturday, January 28, 8 a.m. to 5 p.m.
Intermittent right and left lane closures at the following locations:

  • I-516 westbound at the I-16 Interchange from MP 5 to MP 6
  • I-516 eastbound at the I-16 Interchange from MP 6 to MP 5

Overnight Closures

Monday, January 23, through Saturday, January 28, 7 p.m. to 6 a.m.
Intermittent right and left lane closures at the following locations:

  • I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
  • I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)

 
Monday, January 23, through Saturday, January 28, 9 p.m. to 5 a.m.
Double lane closures at the following locations:

  • I-95 northbound @ I-16 overpass (MP 98 to MP 100)
  • I-95 southbound @ I-16 overpass (MP 101 to MP 98)

Overnight Closure & Detour

Monday, January 23, through Tuesday, January 24, 10 p.m. to 5 a.m. (Nightly)

  • I-16 eastbound to I-95 southbound ramp (Exit 157A) (Map)

Motorists traveling on I-16 eastbound should continue on I-16 eastbound and take the Dean Forest Road ramp (Exit 160), turn left onto Dean Forest Road, turn left onto I-16 westbound, then take Exit 157A to access I-95 southbound.


Long-Term Closure

June 2, 2022, through May 31, 2023
 

  • Tremont Road under I-16 (Map)

Note: Tremont Road will be open during holiday work restriction time frames.
• Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4)


Advisory: Exact times may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *