Connect with us

Chattooga Local News

AllOnAdventure Logo

GDOT Provides Information on Highway 27 Bypass around Summerville

The Georgia Department of Transportation has provided information on the Highway 27 bypass around Summerville.

Project Description

Project EDS-27(95) is proposed to reconstruct and relocate the existing SR 1/US 27 route to provide a four-lane rural bypass around Summerville.

The project would begin near the intersection of Gore-Sublinga Road/CR 329 and SR 1/US 27 with the widening and reconstruction of SR 1/US 27 to a four-lane, depressed median highway through Mack White Gap.

It would then proceed northeasterly on new location to continue the four-lane highway along Taylor’s Ridge to bypass the town of Summerville and then tie into the existing alignment of SR 1/US 27 near East Trion.

The width of the depressed median will vary from 44 feet to 32 feet in areas high roadway cut or fill. The approximate length of the project is 7.6 miles.

The current date for accepting bids on the project is late 2024.

 

 

1 Comment

1 Comment

  1. Kurt

    April 19, 2023 at 11:57 am

    This map does not represent the description in the text of the article, not even close.

Leave a Reply

Your email address will not be published. Required fields are marked *