Connect with us

Bulloch Public Safety

AllOnAdventure Logo

SE Ga Road Work: Weekly Traffic Interruption Advisory Through September 1

Georgia Department of Transportation continues essential road work throughout Southeast Georgia.  As a result, work on construction and maintenance projects will continue Saturday, August 26 through Friday, September 1.

All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.

Traffic interruptions are listed below by interstates, categories, and counties.

Interstate 95

I-95                                                                    McIntosh County
Champney R. Bridge (MP 45.5) to Darien R. Bridge (MP 49.0) 
Lane Closures Monday- Thursday 7pm-7am &
Weekends – Friday 9pm until Monday 5am
Bridge Maintenance/Rehabilitation thru October 2023

I-95 at MP 1.5 – MP 25.5                                  Camden County
Installation of Cable Barrier
Inside Shoulder Closures Daily

Interstate 16                            

I-16 (in the Vicinity of SR 307)                          Chatham County            
Lane Closures for DDI Construction on I-16 & SR 307
Monday – Saturday
· I-16 Eastbound from 9 a.m. to 4 p.m.
· I-16 Westbound from 8 a.m. to 3 p.m.
· SR 307 North from 9 a.m. to 4 p.m.
· SR 307 South from 8 a.m. to 3 p.m.
Continues thru end of September 2023

Bridge & Road Closures with Detours

SR 169 at Canoochee River Bridge                 Evans County
Road Closure June 12 for Bridge Replacement
Expected to Reopen March 2024
Detour via US 301, US 280, SR 129

SR 520 at Satilla River Overflow Bridge         Brantley County 
Lane Closures for Bridge Replacement
Expected to Reopen July 2024
Single Lane Traffic in Both Directions thru Work Zone
On-site Detour: WB Traffic Shift to EB Bridge

Bridge Construction, Rehabilitation, and Maintenance

SR 25 at Houlihan Bridge                                 Chatham County 
Single Lane Closure Utilizing Traffic Signals
Bridge Repair Timeline TBD
Alternate Route via SR 25, SR 30, SR 21, I-95, US 17

Resurfacing

SR 204/ Abercorn St                                          Chatham County
From Georgetown Exit to Stephenson Ave
Lane Closures for Asphalt Resurfacing
Sunday – Friday 7pm to 6am

SR 26/HWY 80                                                    Chatham County
From Bourne Ave to Wilkes Street
Daily/Nightly Lane Closures 9pm to 6am

SR 196/SR 119                                                    Liberty County
From Gate 1 to Gate 5 (MP 4.67 to 7.15)
Lane Closures Friday – Saturday 7pm to 5am

SR 119                                                                  Liberty County
From Airport Rd to SR 138 (MP.0 to 4.67)
Lane Closures Friday – Saturday 7pm to 5am

SR 38/ Old Sunbury Road                                  Liberty County
From Joseph Martin Rd to Old Hines Rd
Nightly Lane Closures for Pipe Installation
Sunday – Friday 7pm to 6am

SR 30                                                                    Evans County
Tattnall/Evans County Line to Cedar St.
Daily Lane Closures 7am to 7pm
4/24/23 – 9/15/23

SR 67 Bypass                                                      Bulloch County
Fair Road to SR 26/US 80
Daily Lane Closures 7am to 8pm
Resurfacing 3/20/2023 – 9/15/2023

SR 130                                      Montgomery/Toombs Counties
From SR 135 to US 1/SR 4
Daily Lane Closures 7am to 7pm
4/3/2023 – 9/15/2023

SR 303                                                                  Glynn County
From SR 520 to SR 25
Daily Lane Closures 7pm to 6am
4/16/2023 – 8/31/2023

SR 25                                                                    Camden County
From Florida Line to MLK Blvd (Kingsland)
Daily Lane Closures
Nightly Lane Closures within City Limits 7pm to 5am
5/5/2023 – 12/31/2023

SR 21                                                                      Effingham County
North of Dewitt Rd to Screven Co. Line
Milling & Resurfacing
Daily Flagging Operation (Detour, Lane Shift)
Monday – Sunday 7am – 8pm
Starting 6/5/2023 – 9/30/2023

SR 21 BU                                                               Effingham County
SR 21 to SR 119
Milling & Resurfacing Daily Flagging Operations
Monday – Sunday 7pm to 6am
Starting 7/20/2023 -9/31/2023

SR 30/US 280                                         Montgomery/Toombs Counties
From SR 135 (Higgston) to SR 4/US 1 (Lyons)
Nightly Lane Closures Sunday – Thursday 6:30pm to 6:30am
8/13/2023 – 12/10/2023

SR 203                                                                   Appling County
From Bacon County Line to Wayne County Line
Daily Lane Closures 7am to 6pm
7/10/2023 – 2/29/2024

SR 25/ US 17                                                        Glynn County
From Sidney Lanier Bridge to SR 25 Spur
Nightly Lane Closures 7pm to 6am
7/18/2023 – 10/31/2023

Other Traffic Interruptions

SR 169                                                                  Evans County
From SR 129 to Riverside Drive
Brewton Park Boat Ramp Access will Remain Open to Public

SR 21/SR 30                                                        Chatham County
I-95/SR 405 to Berrien Rd                            
Nightly Lane Closures for Work on Striping
Monday – Friday 7pm to 6am

SR 40                                                                   Camden County
West of Grove Blvd to East of Truss Plant Road
Widening and Reconstruction for Additional Turn Lanes
Lane Closures Monday – Friday 7am to 5pm
Ends 9/30/2023

SR 25/Burnsed Blvd.                                          Chatham County
US 80/Burnsed Blvd. and SR 25/Brampton Rd.
Road Widening & Paving Operations
Lane Closures Mon. – Fri. 7am to 6pm

  • Burnsed Boulevard reduced to two lanes from Hwy 80 through

the intersection of SR 25. Traffic will move to the southbound lanes,
which will become one lane in each direction.

  • SR25 North from Bay Street closed to through traffic. Only trucks

needing access to Foundation Drive.

SR 25                                                                     Glynn County
Yacht Road to Harry Driggers Blvd
Lane Closures for Widening and Reconstruction
Monday – Friday, 9am to 4pm and 6pm to 7am
Expected Completion 2nd Quarter 2024

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *