Georgia DOT continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, September 25 through Friday, October 1.
All work subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling thru work zones, pay attention and watch for workers.
Traffic interruptions are listed below by interstates, categories, and counties.
Interstate 95 Interruptions
I-95 N at US 80 interchange/Exit 102 off-ramp Chatham County
Lane closures for paving and restriping operations
Nightly 7pm until 5am, Mon. & Tues. nights
Interstate 16 Interruptions
SR67 to I-95 Bulloch, Bryan, Effingham and Chatham Counties
Lane closures for pavement markings
Saturday, September 24 and Friday October 1
From Milepost 126 to 142, 6am to 7pm & 7pm to 6am
I-16 Exits 143, 137, 132, 127, 152
Ramp closure for pavement markings
Nightly 7 p.m. until 6 a.m. (one ramp closure at a time)
Fully signed detours installed nightly
Detour: proceed to next exit, cross over interchange,
opposite direction on I-16, for interchange access
Interstate 516 Interruptions
I-516 WB Exit 7B OFF Ramp Chatham County
Ramp Closure for Concrete Slab Replacement
8 pm, Friday, Sept. 24 continuous through 5:30 am Monday, Sept. 27
Detour: All traffic will use Exit 7A, turn left at the bottom of the ramp on
Augusta Ave., then right onto West Lathrop Ave.
Bridge & Road Closures with Detours
Olive Branch Road (CR 12) over I-16 Bryan County
Road reopened to traffic on September 22
Beaverdam Creek @ Hilltonia-Perkins RD Screven County
Road Closure for the bridge replacement project
Expected reopening: December 2021
Detour Route Waynesboro Hwy (Hwy 24), Bascom Rd
Paxton Rd between Dixie Lake Rd & Marshall Crews Rd Charlton County
Road Closure for bridge replacement project
Expected reopening: December 2021
Detour Route via Dixie Lake Rd and Altman Rd.
SR 168/122 @ Camp Creek Clinch County
Road closure for bridge replacement project
Expected reopening December 2021
Detour route via SR 168, SR 37 and US 221
Bridge Construction, Rehabilitation, and Maintenance
Islands Expressway Chatham County
From Elba Island Rd to Oatland Island Rd
East & West single lane traffic flow on a single bridge
Continuous until further notice
SR4/US1 Over Altamaha River Appling-Toombs Counties
West River Rd. (Appling Co.) to Bob Cato Rd. (Toombs Co.)
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday, from 8:00am to 6:00pm (8-26-21 to 12-31-21)
SR169 at Goose Creek Bridge Wayne County
From Milepost 3 to Milepost 4
Daily Lane Closures for Bridge Construction Activities
Monday thru Friday; 7am to 5pm (6-28-21 to 2-8-22)
Resurfacing
SR 25/US17 Chatham County
Ogeechee River Bridge to I-516 Overpass
NB & SB Lane Closures for Paving Corrective Work
Saturday, September 25 to Saturday, October 2, from 7pm to 6am, Daily
SR 17 (Jimmy Deloach Parkway) Chatham County
From Prescott Road to SR 21 Overpass
NB & SB Lane Closures for Asphalt resurfacing
Saturday, September 25 to Friday, October 1 from 7pm to 6am, Daily
SR 32 Glynn County
SR 27 (Sterling) to Brantley Co. Line
Lane closures for milling and paving operations
Monday thru Friday, 7am to 6pm, until 11/30/2021
SR 25 Glynn County
SR 303 to South of Sidney Lanier Bridge
Lane closures for milling and paving operations
Royal Drive to MP 8.99 (End of Project)
Monday thru Friday; 8:30am to 6pm until 10/15//2021
SR 303 to Royal Drive
Sunday thru Friday; 6pm to 7am until 10/15/2021
SR 301 Evans County
Tattnall Co Line to MP 7
Daily Lane closures for milling and paving operations
Work time restrictions in the School Zone
SR 30 Bryan County
From South Poplar Street and South Industrial Blvd
Mill and Inlay of existing asphalt
Daily Lane Closures 7pm until 6 am – Expect delays
SR 168 Clinch County
MP 0 -7 Surface Treatment and Micro-surfacing
Daily lane closures for asphalt overlay
SR 26 Bulloch County
Daily lane closures from MP 17 to MP 19
Concrete pavement repair and replacement.
SR 30 Toombs County
Weekend Lane closures between MP 3 to MP 8
Concrete replacement at several intersections.
Other Traffic Interruptions
SR 17 @ Blue Jay Rd roundabout Effingham County
Road Open as a 4 way stop.
Curb, Gutter, & Sidewalk installation
Daily Lane Closures from 9am to 4:30pm
SR 40 Camden County
West of Grove Blvd to East of Truss Plant Road
Daily Lane Closures Monday thru Friday, 7am to 5pm
Widening and reconstruction for additional turn lanes
US 301/US 25/SR 23 AT 196 Tattnall County
South of Baxter Durrance RD to North of Mile Field RD
Daily Lane Closures for construction of roundabout
Monday thru Friday 8am to 5pm until Feb. 2022
US 1/SR 4 Toombs County
From George Hill Road north for 9 miles (MP 9)
Daily Lane Closures for Drainage Construction
Monday thru Saturday (September 20, 2021 to September 25, 2021);
8:30 am to 2:30pm & 4pm – 6pm