Know before you go is a helpful slogan in southeastern Georgia as several infrastructure projects continue this week.
Lane closures are listed below by interstates and counties. State Route is listed as “SR” and mile post as “MP”.
Interstate 95
I-95Â at Exit 76 in Liberty County
Exit 76/US 84 nightly ramp work Sunday through Saturday 7 p.m. to 7 a.m.
Traffic detoured to next exit then reverse direction on I-95
I-95Â from MP 87-68 in Bryan and Liberty counties
Single Lane Closures
Sunday through Saturday 7 p.m. to 7 a.m. through Oct. 31
Bacon County
SR 32 Over Little Hurricane Creek
Single lane closure for repainting bridge beams
Sunday through Saturday 7 a.m. to 7 p.m.
Brantley County
SR 23 Over Little Satilla River
Single lane Closure
Sunday through Saturday 7 a.m. to 7 p.m.
SR 520 Over Satilla River
Single lane closure
Sunday through Saturday 7 a.m. to 7 p.m.
Bryan County
SR 144-Widening Project                 Â
Rabbit Hill Road closure
Detour via Rabbit Hill Road to Port Royal Road
US 80Â from Ogeechee River to the Bulloch County line
Nightly lane closures with flaggers for resurfacing
Sunday through Saturday 7 p.m. – 6 a.m.
US 80 Eldora Road to Old River Branch Road
Single lane closures for paving operation
Sunday through Friday 7 p.m. until 6 a.m.
Bryan/Chatham
SR 25 over Ogeechee River
Single lane closure
Sunday through Saturday 7 p.m. to 7 a.m.
Camden/Glynn
SR 25 over Little Satilla River
Single lane closure
Sunday through Saturday 7 a.m. to 7 p.m.
Chatham County
Island Expressway
Oatland Island Road to Elba Island Road
Single lane closures for bridge replacement project
Monday through Saturday 9 a.m. until 3 p.m.
SR 21 resurfacing
SR 30 intersection to Long Street in Rincon
Monday – Sunday 7 p.m. until 6 a.m.
SR 25 Conn/West Bay Street
Continuous traffic shift on westbound outside lane
SR 25 Conn/SR 26 (Bay Street)Â Railroad Crossing
Traffic Detour to Replace railroad crossing, tracks and asphalt
Wednesday @ 9 am to Sunday @ 5 pm
Detour Route:Â SR 25 Conn/West Bay Street to SR 26/US 80:
Traffic will detour at the I-516/SR 21 Northbound on ramp, Traffic will travel north on I-516/SR 21 for approximately one mile to exit 8 (Bay Street/Garden city) then turn right on Main Street Traffic will travel on Main St for .20 miles then turn right on SR 26/US 80 where detour ends
SR 26/US 80 to SR 25 Connector/W. Bay Street:
Traffic will turn left at the intersection of SR 26/US 80 and Burnsed Boulevard and take the I-516/SR 21 southbound on ramp. Traffic will travel south approximately 1.14 miles to Exit 7 (SR 25 Connector/W. Bay Street) then turn right where the detour ends.
Effingham County
SR 21 resurfacing
Long Street in Rincon to SR 30 intersection in Chatham County
Monday – Sunday 7 p.m. until 6 a.m.
HWY 80/SR 26/SR 17Â Wilkes Street to SR 17
Single lane closures for indentation rumble strips
Monday through Saturday 7 p.m. to 6 a.m.
Evans/Bryan
SR 30 Over Canoochee River
Single lane closure
Sunday through Saturday 7 p.m. to 7 a.m.
Glynn County
SR 25/US 17Â Sidney Lanier Bridge
Single lane closure for bridge rehab
Monday through Sunday 6 a.m. to 6 p.m.
SR 303 Over Turtle River
Single lane closure
Sunday through Saturday 7 p.m. to 7 a.m.
Jeff Davis
SR 19 RR Overpass
Detour via SR 135 and SR 135 Conn.
Anticipated completion 2020
Telfair County
SR 27 Over Sugar Creek
Single lane closures
Sunday through Saturday 7 a.m. to 7 p.m.
Ware County
SR 158Â between Hutch Lane and Barnes Road
Road closure for three bridges to be replaced
Anticipated open to traffic spring/summer 2020