Connect with us

Georgia News

AllOnAdventure Logo

Georgia DOT to Offer Virtual Industry Forum for Design-Build Teams for US 280/SR 30 Project in Bryan County

The Georgia Department of Transportation (Georgia DOT) has announced a virtual Industry Forum for the US 280/SR 30 Widening and Interchange Improvement Project (PI 0016618). The project consists of widening US 280/SR 30 from two lanes to four lanes from just south of Olive Branch Road to Oracal Parkway. Additionally, the following roundabouts are proposed at each intersection: two roundabouts at the I-16 ramps, a roundabout at Oracal Parkway, a roundabout at Dillon Drive, and a roundabout at the new I-16 Frontage Road.

This improvement project is part of a series of projects that will provide more efficient access to a new Bryan County Mega-site development and the surrounding area. The Georgia DOT projects, and Bryan County Mega-site development are separate endeavors.

When:
Friday, April 14, 2023

  • Interested attendees are strongly encouraged to preregister for the Industry Forum. Registered attendees will be emailed an early access link to the presentation on Thursday, April 13, 2023, at 8 a.m. EST.
  • Within 24 hours (Friday, April 14, 2023), the prerecorded Industry Forum presentation will be posted to the Design-Build web page with the link to the presentation and a list of registered attendees, including contact information.
  • One-on-one meetings will be held on April 18 and April 19, 2023.
  • For additional information, refer to the Public Notice Advertisements (PNA) located on the Georgia Procurement Registry (GPR)


Where:
Online prerecorded presentation will be published on Georgia DOT Design-Build web page. Interested parties can preregister here.

More:
More about Georgia DOT Design-Build projects can be found here: https://www.dot.ga.gov/GDOT/pages/DesignBuild.aspx.

Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *